Energy Savings of a Water Injection Plant

Before STEMS Merit Energy was using 170,000 KWH per month. After STEMS units were installed and the system revised, KWH fell to just 126,000 per month, resulting in a 26% savings.

File: merrit_energy.doc

Understanding the Frontier Energy System for Electrical Conservation

This is a sample report based on actual pre and post data from a Frontier Energy System.

File: Sample.pdf

Cold Storage

Frontier began the project by completing a comprehensive facility assessment of the electrical systems within the facility. Recommendations were made and implemented by our engineers on the motor driven systems.

Based on measurement and verification by Frontier and a third party (the Utility Provider). After this project was completed, the facility's KW peak demand fell 30%, off-peak demand fell 30%, average kWh usage plummeted by 24,600, delivering a simple payback of just over 1 year.